A work crew from JCP&L was on site to remove a utility pole from English Plaza today. The Contractor installed the polymer mixture on the remaining pavers, and the landscaper was on site to water and check the plant installations. The landscaper and a JCP&L crew will be back on site tomorrow, with light fixture installation beginning later this week. The Borough of Red Bank will be temporarily striping the remaining parking areas in English Plaza, as well as the loading zone on W. Front Street at the end of Emanuel Court.