Update: June 6

Today, drainage work continued, and electrical conduit was placed in English Plaza. Tomorrow, June 7, drainage work and paver installation will continue, and site cleanup will commence. Both lanes of White Street will be open to vehicles. Use these hashtags Read more…

Update: June 5

On Wednesday, June 5 curbs were poured in the White Street lot. Concrete sidewalk in English Plaza was removed for replacement, and stormwater pipes were placed. Tomorrow, June 6, stormwater drainage work continues. Both lanes of White Street will be Read more…

Update: June 3

Demolition began in the White Street lot today. Existing curb and sidewalk were removed, and curb forms were placed. Tomorrow, June 4, new curbs will be poured. Both lanes of White Street will be open. #whitestreet #englishplaza #redbanknj

Update: May 31

Paver placement continued today on White Street. No construction will take place over the weekend! Work resumes on Monday, June 3, with the finishing of the paver installation work up to the White Street lot and the beginning of demolition Read more…

South side of White Street in Red Bank, NJ. Construction view of new curbing.

Update: May 29

Today, electrical conduit was installed on the south side of White Street, along with sidewalk sub-base installation and compaction. Tomorrow, 5/30, sub-base construction will continue, and concrete aprons will be poured. Safe walkways will be provided to all open businesses.

Sidewalk removal on south side of White Street, Red Bank, NJ

Week Two

Work on White Street resumes on Tuesday, May 28. White Street, from Broad Street to English Plaza, will be closed on Tuesday and Wednesday, May 28 and 29. The closure is required for the demolition of the sidewalk and the Read more…